In 2021 the wind park was visited to conduct an inspection in order to evaluate the performance after 9 years in service. The performance is of special importance since the present Hempatop Direct 700 is the upgraded version of Hemparea DTM 55973.
The inspected towers in Stamåsen Wind Park are in excellent condition. There can be found no areas with breakdown and no indications of beginning breakdown in the coating system on any of the eight towers (30 percent of the turbine towers at Stamåsen) in the survey.
The stability of the coating system, being paint directly on blasted steel, paint on metallising or paint on the conversion pre-treated nuts is also well proven at the limited areas of mechanical damage. There is no spread of damage, no corrosion creep and extremely limited red or white rust.