Wikinger wind farm – clean energy for thousands
350 MW Iberdola windfarm provides 20% of local power.
After unveiling plans in 2014 to install 70 turbines off the North German coast in the Baltic Sea, Iberdrola reached a new milestone in its history when it connected its impressive 350 MW Wikinger windfarm to the German power grid in late December 2017. At full nominal capacity, they are supplying clean energy to over 350,000 households.

The trial
Finally, the towers have a 60-micron topcoat of Hempathane HS 55610 on both inner and outer surfaces, tinted to Iberdrola’s required colour scheme to ensure they maintain the same level of visibility for shipping and that they complement their surroundings with minimal maintenance over many years.
The Wikinger windfarm is another example of Hempel’s significant position in developing and supplying protective coatings for the offshore market.
Download the case story
Dive deeper
Featured product brands
Our Cases
How we’ve helped our customers
Hempel protects the world's most powerful floating wind turbine foundation
The Three Gorges 16MW floating wind turbine operates in an extremely corrosive offshore environment located in China.
Wikinger wind farm – clean energy for thousands
Hempel coated the "Andalucía" offshore sub-station transported to Germany with our versatile activated- zinc primer Avantguard®.
+30 years service life in the most aggressive environments with Hempel coatings.
Horns Rev 1 was the first offshore wind farm in the North Sea, introducing solvent-free epoxies technologies that later become industry standard.