Innovation, beautiful design and practicality– award-winning ingredients in Prague
The beautiful design is developed to suit the construction process and carries the heavy loads of tramways, cars, and pedestrians into the heart of Prague. The bridge promotes the qualities of steel by its visible slender structure and elegance. The effective lighting accentuates the expressive form. Troja Bridge is like a sculpture, and a beautiful addition to the city of Prague.ECCS’s Steel Bridge Award jury
The challenge

The solution
On this occasion, the primer was applied in the workshop before the main steel parts were transported to the site. Following touch-up work in assembly areas, a second primer and intermediate layers were applied using Hempadur Fast Dry 15560, which enabled work to progress smoothly while also reducing the risk of affecting property around the site. Finally, the bridge was roller-coated with Hempathane HS 55610, the fast-dry version of our polyurethane topcoat with zinc phosphate that provides the highest standards of long-lasting colour fastness and dries to touch in just 3 hours at 20ºC.
Download the case story
Our Cases
How we’ve helped our customers

Tower Bridge restored to true colours
One of London’s best known landmarks restored and protected with 22,000 litres of high performance coatings

Trusted corrosion protection for Queensferry Crossing, Scotland
International collaboration protects the world’s longest three-tower cable-stayed bridge from corrosion in tough coastal conditions

Long-term protection and lower project costs for railway bridges
Advanced two-coat Avantguard system delivers high anti-corrosive performance with 40% lower DFT, increasing productivity and reducing costs.