Iconic port crane rehabilitation assured with Hempel integrated solution
The huge Titan crane in the port of Leixões in Portugal has been an industrial landmark for over 130 years, visible from both land and sea. Years of exposure to the harsh marine environment had left the crane unusable. Then, in 2021, the port authorities decided to rehabilitate the crane ready for re-use. Hempel put together an integrated solution for the project.
An integrated solution from Hempel comprises a unique package of products and services, tailored to meet the needs of each project. In the case of the Titan crane, the solution included a coatings package based on our award-winning Avantguard activated zinc primer, technical support from our Services team in Portugal and a performance guarantee.
As well as increasing efficiency during application, this combination will ensure that the iconic Titan crane remains corrosion free for many years, despite the extremely harsh marine environment.
The challenge
The solution
Avantguard coating system and Hempel Services guarantee coating performance
Thanks to activated zinc technology, our Avantguard zinc epoxy primers utilise three methods of corrosion protection: the barrier, inhibitor and galvanic effects. As a result, Avantguard coatings can provide the same or better corrosion protection than other zinc-rich coatings, with fewer coats or at thinner dry film thicknesses. This helps extend coating lifetime and reduce maintenance requirements, while also reducing paint consumption and VOC emissions during application. Avantguard primers also dry significantly faster than other zinc-rich coatings and remain easy to apply, even in high humidity and at different temperatures.
To give Mecwide, Vesam Group and Prozinco additional peace mind, our solution also includes a performance guarantee, which guarantees that the coating system will protect the crane for at least 25 years.
At a glance
- Customer: Vesam Group, a pioneer in creating integrated and innovative solutions in metallic and mixed structures
- Sub-contractor: Prozinco, a civil construction company with long experience in anti-corrosion protection of new constructions and rehabilitation projects
- Project: The iconic Titan crane in the port of Leixões, Portugal
- Coating system:
- Primer: Avantguard 750
- Intermediate: Hempaprime Multi 500
- Topcoat: Hempathane HS 55610
- Area: 4,000 m2

Dive deeper