Providing innovative coating solution for offshore wind farm
The expansion project with an installed capacity of 300MW of the offshore wind farm in Xuwen County, Zhanjiang City owned by the State Power Investment Corporation Limited (SPIC) is expected to send 0.899TWh to the power grid annually once all of its generator units are connected to the grid and put into production, equivalent to the basic electricity consumption of 370,000 households throughout the year. With this project, about 272,000 tons of standard coal will be saved and carbon dioxide emissions will be reduced by 723,300 tons each year. It will effectively push forward the overall strategic planning of new energy projects in Zhanjiang City and Xuwen County, accelerate the important development of modern economic zones along the coast, and provide firm energy security.
With rich experience in the protection of wind power facilities and a proven track record in this industry, Hempel provided customized coating solutions for this project. For the jacket foundations and pipe piles, we provided our innovative product Hempaprime Strength. This product contains reinforced glass flakes, which can form a highly resilient and high-quality film after curing, providing long-term protection for offshore wind power equipment in splash zones and fully immersive zones and thus reducing the need for maintenance.
The challenge
The solution
Hempaprime Strength provides protection for offshore wind farm in Zhanjiang
In response to the needs of the client, Hempel provided an innovative coating solution based on Hempaprime Strength. This product can provide long-term protection for offshore wind power equipment, not only suitable for environments with heavy corrosion such as splash zones but also suitable for those with permanent immersion. As a high-build and self-priming epoxy coating, Hempaprime Strength will form a wear-resistant and corrosion-resistant layer after curing. With reinforced glass flakes, this product offers superior resistance to wear and chemicals.
At a glance
- Location: China
- Project: SPIC Zhanjiang Xuwen offshore wind farm 300MW expansion project
- Product: Hempaprime Strength
- Applied area: Jacket foundations and pipe piles
- Year: 2023
