Case Stories | Wind
How we’ve helped our customers
Hempel protects the world's most powerful floating wind turbine foundation
The Three Gorges 16MW floating wind turbine operates in an extremely corrosive offshore environment located in China.
Hempel’s contribution to the booming Dutch renewables industry
Hempel coated two offshore wind stations for Tennet in the Netherlands. For this harsh environments, Avantguard ensured high protection.
Avantguard® 860 reduces project time for offshore substations
Quick drying time for an offshore substation is key. Avantguard® 860 delivered superior anti-corrosion protection and increased productivity.
Providing excellent protection for offshore platforms
Hempaprime Strength was recommended to China's largest fabrication yard for its strong protection
Avantguard 750 reduces project costs for Chantiers de l’Atlantique
Avantguard reduces project costs in offshore installations in the French coast providing optimum protection in harsh offshore conditions.
Protecting XXL monopiles for one of the world´s largest offshore wind farms
Hempaprime Strength 530 epoxy was chosen for its ability to provide high corrosion protection in aggressive offshore environments
+30 years service life in the most aggressive environments with Hempel coatings.
Horns Rev 1 was the first offshore wind farm in the North Sea, introducing solvent-free epoxies technologies that later become industry standard.
Wikinger wind farm – clean energy for thousands
Hempel coated the "Andalucía" offshore sub-station transported to Germany with our versatile activated- zinc primer Avantguard®.
Providing innovative coating solution for offshore wind farm
For the jacket foundations and pipe piles in China offshore wind farm, we provided our innovative product Hempaprime Strength.